Storage King & HighNdry Kurnell
Kurnell, NSW
Nicholls Construction Group built the Storage King and HighNdry facility at Kurnell. HighNdry is a related business, and we build the properties our related businesses operate from. The photos run from the cleared site and bulk earthworks through slab reinforcement and pours to steel framing and tilt-panel erection.
[Project summary placeholder – client, scope, timeframe and outcome to be supplied.]
- Location
- Kurnell, NSW
- Photos
- 25
- Works
Photos
Steel portal frame and slab
Slab reinforcement from above
Crane lifting a tilt panel
Crane erecting the steel frame
Bulk earthworks
Slab formwork and reinforcement
Steel frame over slab preparation
Cleared site before works
Slab reinforcement ready for the pour
Slab reinforcement ready for the pour
Slab reinforcement ready for the pour
Slab reinforcement ready for the pour
Slab reinforcement ready for the pour
Slab reinforcement ready for the pour
Slab reinforcement ready for the pour
Slab finishing
Tilt panel being braced
Steel frame and tilt panels
Tilt panels with elevated work platform
Crane lifting a tilt panel
Crane standing tilt panels
Stormwater pipe works
Elevated work platform at the panels
Tilt panels and crane
Tilt panels and steel frame
Have a project in mind?
Office hours 7am – 5pm, Monday – Friday · info@nicconnsw.com