Concrete batching facilities are what Nicholls Construction Group specialises in. In more than 40 years in construction, we have built the civil works that a concrete plant runs on, from early earthworks and retaining through to the pavements the trucks drive on.
Our project photos show the full sequence on working plant sites: bank drilling and early works, ground bin excavation and panels, load tower base steel, conveyor tunnels and pits, washout pits, water storage, office slabs and the finished pavements.
What’s involved
- Site preparation, excavation and filling
- In-ground aggregate storage and ground bin panels
- Load tower and silo bases
- Conveyor tunnels and conveyor pits
- Washout, stirrer and water storage pits
- Retaining walls and spraycrete
- Ramps, hardstands and plant pavements
Related services
- Planning – Turnkey projects start with planning and approvals, sequenced by the team that builds the site.
- Project Management – Multiple project managers and our own equipment, with capacity to run several jobs at once.
- Excavation – Early works, bulk excavation, earthworks, shored excavation, trenching and filling.
- Precast & Insitu Concrete – Precast and tilt panels lifted into place, plus slabs, walls, tunnels and pits poured in place.
- Pavement – Heavy-duty concrete pavements, ramps, hardstands and loading bays.