Drainage is part of the civil works on the sites we build. Nicholls Construction Group excavates the trenches, lays the pipe, builds the pits and backfills and reinstates the surface.
Our photo records show pipe laid in shored trenches, pipe bedding and connections, pits formed and poured on site, pit lids installed, compacted backfill and concrete reinstatement on previous jobs, plus stormwater pipe works at Kurnell and drainage works between the factory units at Hervey Bay.
Drainage is delivered as part of our turnkey projects, from planning and approvals to handover, across NSW and QLD.
What’s involved
- Trench excavation, shoring and pipe bedding
- Stormwater pipe laying and connections
- Concrete pits, bases and lids
- Backfill, compaction and surface reinstatement
Related services
- Pits – Washout, conveyor, stirrer and water storage pits built to suit the plant.
- Excavation – Early works, bulk excavation, earthworks, shored excavation, trenching and filling.
- Precast & Insitu Concrete – Precast and tilt panels lifted into place, plus slabs, walls, tunnels and pits poured in place.
Project photos
Kurnell – Stormwater pipe works
Shored trench with pipe bedding
Pit base pour
Pit lid installed
Hervey Bay – Drainage works between units
Compacting trench backfill
Related projects
Various previous jobsPast works
25 photos
Kurnell, NSWStorage King & HighNdry Kurnell
25 photos
Hervey Bay, QLDHervey Bay 40 SCC
25 photos